Every point is sampled from the compiled MuJoCo contact geometry (0.22 mm edge step). Poses and per-hook flexural strain are interpolated directly from the recorded MuJoCo solver trajectory. Red marks hooks exceeding the 2.5% ABS allowable strain limit.
Factory deployed engineers (FDEs) work alongside your team and bring in the signals your stations already record during EVT, DVT and PVT. Planned inputs:
Every unit on this line is run through station scatter and part tolerances:
S1–S5).This is a draft twin: generic stations, synthetic parts, and no real build data yet.
Every number here is simulated from the spec’s tolerances and the station assumptions. None of it is calibrated against a real line yet, and the layout, equipment and product geometry are assumptions.
Space play or pause · G real line or golden twin · O a station’s collision surfaces · ← → step the tour · WASD walk · Esc close